AGMA
|
- American
Gear Manufacturers Association |
| |
AISC |
- American Institute
of Steel Construction |
| |
ANSI |
– American
National Standards Institute |
| |
ASCE |
– American
Society of Civil Engineers |
| |
ASTM |
– American
Society of Testing Materials |
| |
AWS |
– American
Welding Society |
| |
CMAA |
– Crane Manufacturers
Association of America |
| |
ETL |
– ETL Trademark
of Intertech Testing Services (electrical) |
| |
HMI |
– Hoist Manufacturer’s
Institute |
| |
NEC |
– National
Electrical Code |
| |
NEMA |
– National
Electrical Manufacturers Association |
| |
OSHA |
– Occupational
Safety and Health Act |
| |
UBC |
– Uniform
Building Code, with Oregon amendments |
| |
UL |
– Underwriters
Laboratories |
| |
|
|
| |
Additionally: |
| |
1. |
All steel will require
mill certifications |
| |
2. |
Certified Welders as
outlined by the American Welding Society will perform welding. |
| |
3. |
All welds will be stamped
by person performing weld and by Quality Control Inspector upon approved
inspection. |
| |
4. |
All holes will be drilled
with roto-broach type drill or punched in Ironworker. No burned holes
are allowed. |
| |
5. |
Layout will be approved
for drilling by Quality Control Inspector before holes are drilled
or punched before beams are cut and brackets are welded, etc |
| |
6. |
All electrical work
will completed in-house by personnel under the direct supervision
of a Journeyman Electrician. Only Journeyman Electrician will perform
all wiring completed outside of the shop. |
| |
7. |
Upon completion of
crane and final paint, a performance test will be completed and documented
on Quality Control Checklist. |
| |
8. |
The crane will be painted
to customer’s specifications with Quality Control Personnel
documenting its completion. |
| |